Please follow the steps for Ebusiness Suite Release 12.1 Installation.
* Kindly make sure that you have following RPM's installed on the system.
RPM's for 11g Database( to be installed on database node):
* compat-libstdc++-33-3.2.3-61.x86_64
* elfutils-libelf-devel-0.125-3.el5.x86_64
* elfutils-libelf-devel-static-0.125-3.el5.x86_64
* libaio-devel-0.3.106-3.2.x86_64
* unixODBC-2.2.11-7.1.i386
* unixODBC-devel-2.2.11-7.1.i386
* unixODBC-2.2.11-7.1.x86_64
* unixODBC-devel-2.2.11-7.1.x86_64
* kernel-headers-2.6.18-8.el5.x86_64
RPM's to be installed from the Linux Distribution media.
* gcc-4.1.2-14.el5.x86_64
* gcc-c++-4.1.2-14.el5.x86_64
* glibc-2.5-18.i686 (32-bit)
* glibc-2.5-18.x86_64
* glibc-common-2.5-18.x86_64
* glibc-devel-2.5-18.i386 (32-bit)
* glibc-devel-2.5-18.x86_64
* libgcc-4.1.2-14.el5.i386
* libgcc-4.1.2-14.el5.x86_64
* libstdc++-devel-4.1.2-14.el5.i386
* libstdc++-devel-4.1.2-14.el5.x86_64
* libstdc++-4.1.2-14.el5.i386
* libstdc++-4.1.2-14.el5.x86_64
* make-3.81-1.1.x86_64
* gdbm-1.8.0-26.2.1.i386
* gdbm-1.8.0-26.2.1.x86_64
* libXp-1.0.0-8.1.el5.i386
* libXp-1.0.0-8.1.el5.x86_64
* libaio-0.3.106-3.2.i386
* libaio-0.3.106-3.2.x86_64
* libgomp-4.1.2-14.el5.x86_64
* sysstat-7.0.0-3.el5.x86_64
* util-linux-2.13-0.45.el5.x86_64
* compat-libstdc++-296-2.96-138.i386
* compat-libstdc++-33-3.2.3-61.i386
RPM's to be downloaded from http://oss.oracle.com/projects/compat-oracle/files/Enterprise_Linux/
* openmotif21-2.1.30-11.EL5.i3861
* xorg-x11-libs-compat-6.8.2-1.EL.33.0.1.i386
* binutils-2.17.50.0.6-9.0.1.x86_642
* After you have made the stage, please download the patch(8626041) from Metalink and extract it into the startCD.
* After the installation the Oracle HTTP Server would be dead, to make it alive you will have to apply a patch 6078836(down loadable from Metalink), it will start the HTTP services.
* Additionally please follow the Metalink documents [761566.1] [798258.1].
No comments:
Post a Comment